Delivery and installation
Window manufacturing takes 10–14 working days, delivery within Kyiv is free, and one to three windows are installed in a single day.
Delivery
Once the contract is signed, we send your window measurements to the factory. The day before delivery we call you to agree on a time. We deliver the windows in protective packaging, carry them into your flat and start the installation straight away. Delivery within Kyiv is free; delivery in the Kyiv region is by arrangement.
Installation
- We protect the floor and furniture with film.
- We carefully remove the old windows and prepare the opening.
- We set the frame level and fix it with anchors or mounting plates.
- We fill the gap with expanding foam and seal it with tapes.
- We hang the sashes, adjust the hardware and fit the external sill.
- We clean up after ourselves and take the rubbish away.
Standard and warm installation
| Type of installation | What's included | Approx., UAH/m² |
|---|---|---|
| Standard | levelling, fixing, expanding foam, sealing | ~600 |
| Warm, to DSTU | the same + internal vapour barrier and external diffusion tapes | ~1,000 |
| Removal of the old window | removal, carrying out and rubbish disposal | ~200 |
Warm installation protects the foam from moisture and UV radiation, so the joint does not freeze through for years. Find out more in the article “Warm window installation: what it is and why it matters more than the profile”.
Additional work
On request, we can fit window sills, external sills, reveals and insect screens. The cost of additional work is calculated during measurement, and you can estimate the price of the window itself with installation in the calculator.